647 Chair Position Sensors Test and Repair
1.Verify position sensor shoulder bolts are tight, 50 ft-lbs.
This step does not apply to the Base sensor.
2.Perform Output Voltage Test, at the Sensor.
This test must always be performed first. The results of this test determine the next required action.
Sensor |
Affected Function |
---|---|
Back Sensor |
Back Up / Down |
Crash Avoidance System |
|
Position Programming |
|
Tilt Sensor |
Tilt Up / Down |
Crash Avoidance System |
|
Position Programming |
|
Base Sensor |
Base Up / Down |
Crash Avoidance System |
|
Position Programming |
1.Set meter to VDC
2.Place meter probes on proper terminals, See illustration.
3.Run desired function up and down. Watch meter reading as function moves.
Meter Reading |
Required Action |
---|---|
Voltage steadily increases / decreases as function moves up / down |
Perform Output Voltage Test at PC Board. |
Voltage does not change, or changes erratically moves up / down |
Perform Supply Voltage Testing at the Sensors. |
1.Disconnect the White and Black wires at J7 and J8 on Main PC Board.
2.Connect Black wire to J7 and White wire to J8.
3.Perform Output Voltage Test on the Tilt Up function by pressing the Tilt Down button.
Do not run Tilt Up function beyond the halfway position.
4.Reconnect White wire to J7 and Black wire to J8.
5.Perform Output Voltage Test on the Tilt Down function.
1.Set meter to VDC.
2.Place meter probes on proper wires. See illustration.
3.Run desired function up and down. Watch meter reading as function moves.
Each sensor has a different voltage range. The important thing to watch for is whether the voltage changes as the functions moves.
Meter Reading |
Required Action |
---|---|
Voltage steadily increases / decreases as function moves up / down |
Replace PC Board. See Note. |
Voltage does not change, or changes erratically moves up / down |
PC board OK. Inspect wire harness connections. |
Before replacing PC board, be sure shoulder bolt at the sensor pivot point is tight. If bolt is loose, tighten it, then recalibrate PC board and check for proper operation.
1.Set meter to VDC.
2.Place meter probes on proper wires. See illustration. Check meter reading.
3.With meter probes in the same position, run Base function to max. / min. position. Check reading as function moves.
Meter Reading |
Required Action |
---|---|
2 to 4 VDC |
Perform Position Sensor Adjustment. Replace position sensor if necessary. |
Less than 2 VDC or more than 4 VDC |
Perform Supply Voltage Test at the PC Board |
Reading changes erratically as Base moves up / down. |
Perform Supply Voltage Test at the PC Board |
1.Set meter to VDC.
2.Place meter probes on proper wires. See illustration. Check meter reading.
Meter Reading |
Required Action |
---|---|
2 to 4 VDC |
Replace wire harness between the sensor and junction board or between the junction board and PC board |
Less than 2 VDC or more than 4 VDC |
Replace PC board |
If initial reading is less than 2 VDC or more than 4 VDC, unplug J11 connector and check meter reading at pins on PC board, same location.
Meter Reading |
Required Action |
---|---|
2 to 4 VDC |
Replace sensor wire harness |
<2 VDC |
Replace PC board |
>4 VDC |
Replace PC board |
Sensor |
Function Position |
Voltage Reading for SNs V2200 thru V921393 |
---|---|---|
Base |
all the way up |
1.7 to 2.1 VDC |
Back |
all the way up |
2.4 to 2.6 VDC |
Tilt |
all the way down |
1.8 to 2.1 VDC |
1.Remove main PC board cover.
2.Place meter probes as shown to test desired sensor.
3.Position chair function as indicated in the chart. Turn sensor knob until voltage reading is in the indicated range.
If position sensor wiring is disconnected you must recalibrate the PC board. Failure to do so will cause the chair to malfunction.
4.Perform PC Board Calibration Procedure. Refer to: Main PC Board