Midmark M9® -05x / M11® -05x Sterilizer Power Supply Test and Repair
To prevent risk of shock always disconnect power before removing covers or performing any service procedure.
Some procedures require power to be connected with covers removed. Line voltage is present. Use extreme caution to prevent electric shock.
|
Model |
M9 -050, -053 | M11 -050, -051, -053 |
| Serial Number | All | All |
VDC Test
For proper test point readings, meter leads need to penetrate PC board conformal coating.
1.Confirm all power supply harnesses are connected properly.
2.Power on Product.
3.Set meter to VDC.
4.Use meter probes to measure the 12VDC net on the main control board which is from TP291 to TP292.
5.When 12V power is present, D24 should illuminate.
|
Meter Reading |
Required Action |
|---|---|
|
12V Net (TP291 and TP292) = approximately 12 VDC |
Power Supply is OK. |
|
If VDC reading is low, investigate these items to determine if they are causing a short circuit prior to replacing the Power Supply: Door Motor, Hall Effect Sensor, Door Dry Position Switch, 12VDC to Display, Fans, Water Level Sensor, Steam Temp Sensor, Auto Fill Accessory. |
Replace faulty component or assembly. |
|
VDC reading is low and no other faulty components are detected. |
Replace Power Supply. |
