Anesthesia Scheduled Maintenance Chart
| Scheduled Maintenance | ||
|---|---|---|
| Interval | Inspection / Service | Description |
| Before Every Surgery | Inspect | Check machine connections and rubber parts for looseness, damage or wear. Replace as necessary. |
| Perform Leak Test |
Refer to: Leak Test Procedure. |
|
| Daily | Clean |
Refer to: Cleaning Anesthesia Machine. |
| Weekly | Change Absorbent Material | Follow manufacturer’s recommendations for proper use of CO2 absorbents. |
| Annually | Service Vaporizer | Service and calibrate vaporizer. |
| Every 2 Years | Replacement | Replace components found in maintenance kits. O-rings, gaskets, valve discs, breathing circuit, breathing bag, and tubing. |
|
Date of Service:
|
Model Number:
|
|
|
Location:
|
Serial Number:
|
|
|
Service Technician:
|
Notes:
|
|
