Anesthesia Scheduled Maintenance Chart

Scheduled Maintenance
Interval Inspection / Service Description
Before Every Surgery Inspect Check machine connections and rubber parts for looseness, damage or wear. Replace as necessary.
Perform Leak Test

Refer to: Leak Test Procedure.

Daily Clean

Refer to: Cleaning Anesthesia Machine.

Weekly Change Absorbent Material Follow manufacturer’s recommendations for proper use of CO2 absorbents.
Annually Service Vaporizer Service and calibrate vaporizer.
Every 2 Years Replacement Replace components found in maintenance kits. O-rings, gaskets, valve discs, breathing circuit, breathing bag, and tubing.

Date of Service:

 

Model Number:

 

Location:

 

Serial Number:

 

Service Technician:

 

  Notes: