Anesthesia Scheduled Maintenance Chart
Scheduled Maintenance | ||
---|---|---|
Interval | Inspection / Service | Description |
Before Every Surgery | Inspect | Check machine connections and rubber parts for looseness, damage or wear. Replace as necessary. |
Perform Leak Test |
Refer to: Leak Test Procedure. |
|
Daily | Clean |
Refer to: Cleaning Anesthesia Machine. |
Weekly | Change Absorbent Material | Follow manufacturer’s recommendations for proper use of CO2 absorbents. |
Annually | Service Vaporizer | Service and calibrate vaporizer. |
Every 2 Years | Replacement | Replace components found in maintenance kits. O-rings, gaskets, valve discs, breathing circuit, breathing bag, and tubing. |
Date of Service:
|
Model Number:
|
|
Location:
|
Serial Number:
|
|
Service Technician:
|
Notes:
|